OFPC Project No. 703-039 M.D. ANDERSON CANCER CENTER
Ambulatory Clinical Building
55050.00
AV BID AUDIO VISUAL SYSTEM
03/11/04 11738 -22
L. Interconnect Wiring – Provide and install following cable as required for connections in all areas. Meet
provisions of N.E.C.
Audio Plenum Rated Cable: West Penn 25452, West Penn 25291, or similar.
Composite Video Plenum Rated Cable: West Penn 25806
RGBHV Plenum Rated Cable: West Penn 258195 or Belden 1826A or Liberty RGB5C-SD-PLN.
Control Plenum Rated Cable: Control Plenum Rated Cable: West Penn D25350
Control CAT5E Plenum Rated Cable: West Penn 254245.
Loudspeaker plenum cable: West Penn 25226
PART 3 - EXECUTION
3.1 INSTALLATION
A. General Guidelines
1. Quality of Work - Perform labor to accepted industry standards and state and local codes to
accomplish complete and working system.
2. Material and Labor - Provide specified products and other incidental materials, appliances, tools,
and transportation required for complete and functioning systems. Provide personnel to perform
labor who are skilled in techniques and technical knowledge of sound and audio-visual system
installations.
3. Documents at Job Site - Keep following documents at job site during entire construction period.
a. Complete Specifications and Drawings
b. Approved Shop Drawings
c. Approved Product Data
d. Progress Set of Project Record Documents
4. Mounting - Mount equipment and enclosures plumb and square. Ensure that permanently
installed equipment is firmly and safely held in place. Design equipment supports to support loads
imposed with project safety factor of 5 or greater. For devices hung overhead, obtain review by
Structural Engineer licensed to practice in State of Texas.
5. Minor Equipment Moves - The process of equalizing and testing sound systems may necessitate
moving and adjusting certain component parts such as loudspeakers. Perform requested minor
moves during Final Tests and Adjustments without claim for additional payment.
6. Dimension Verification - Verify dimensions and space requirements to assure that proper
mounting, clearance, and maintenance access space is available for system components.
7. Grommets - Cover edges of cable pass-through holes in chassis, rack, boxes, etc. with rubber
grommets or Brad GRNY nylon grommets.
8. Future Maintenance Access – Install equipment rack and mixing consoles allowing access to rear
connections by maintenance personnel without removal or disconnection of equipment. Install
field devices and field wiring such that maintenance personnel can access terminations and
splices without special equipment or disconnection of installed equipment.
9. Coordination - Coordinate work with other trades to avoid delays in construction schedule. Meet
construction schedule.
10. Clean-Up - Leave project clean each day. Place debris where designated by General Contractor.
Debris includes but not limited to: solder splatter, cable ends, stripped insulation, spent crimp
connectors, gypsum board and ceiling tile dust, and product wrappings and cartons. After
completion of installation, thoroughly clean areas worked, including non-visible areas such as
equipment rack interiors, rack top panels, and inside lockable floor and wall boxes.
B. Labeling
1. Equipment Labels - Audio Visual Contractor to provide engraved lamicoid labels on front and rear
of rack-mounted equipment. Mount labels plumb and square. Include schematic reference
design, item name, and system or area controlled by labeled component. On program preamps
and mixers, provide label for each input indicating which source is controlled by labeled channel.
Unless otherwise indicated, provide permanently-mounted black labels engraved with 1/8-inch